This project was a covered loading dock addition to a warehouse in Annville. The roof system was a pre-engineered steel building with a wind screen on the one end.
This project was a pre-engineered steel addition to an existing Auto Body Shop. The intended use of the addition is to house a paint booth and mixing room for automotive finishing.
This project involved adding a handicap ramp and an elevator to make the building accessible to meet the current codes. A new curtain wall was added at the main entrance to the building.
This project included interior remodeling, accessibility improvements, electrical service replacement, and fire suppressant reconfiguration and certification.